Heavy equipment and dump trucks worked throughout the fall and winter in an enclosed, climate controlled and fully lit environment. New foundations, underground utilities and floor slabs were installed. Up to 10 vertical feet of ledge was removed to allow for a new interior elevator. ![]() Concrete was removed and crushed/recycled for subbase gravel on this and other projects. ![]() Crews constructed a new multi-story building inside an existing building. A new, irrigated sod soccer field was constructed to expand offerings for employee break and off time activities.įall 2019 saw our work start in earnest to convert a 110,000-sf warehouse space into a multi-story office and convention center. This project started in early summer 2019 with the relocation/installation of new power and communications duct banks to prepare the campus for the new facility. Site improvements include large areas of porous pavements that will help to protect the nearby Concord Gully Brook Watershed from uncontrolled runoff. The project involves repurposing an existing long time manufacturing facility into a new corporate office and event center for LL Bean in Freeport, Maine. Zachau Construction of Freeport, Maine is The Project Construction Manager on the roughly $100M project. The $13M project – started in summer 2019 is now over 50% complete and set for final completion in the fall of 2023. January 2022 started with the issuance of a “Certificate of Occupancy” for the newly completed First Phase of the multi-part/multi-year LL Bean Outsider Corporate Campus Expansion.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |